Competition: Develop Engineering Designs and Supervise Works for the Rehabilitation of an Existing Irrigation and Drainage Network for a Command Area of 160 Acres in Valley of Peace Community
Develop Engineering Designs and Supervise Works for the Rehabilitation of an Existing Irrigation and Drainage Network for a Command Area of 160 Acres in Valley of Peace Community
Description:
This assignment is aiming at: (i) developing of a set of Bidding Documents for rehabilitation/ modernization of main irrigation and drainage network for a command area of about 65 ha (160 acres), which should allow the contractor to prepare a realistic bid to achieve good quality of works with reasonable quality control and provide the PMU (hereinafter called the “Client”) with a tool for quality assurance and contract management; and (ii) supervision of civil works implementation.
The design shall take into account the need for low cost, robust/climate resilient construction that is simple to implement and to operate and maintain. The final choice for proposed rehabilitation shall be based on technical and financial analyses of alternative designs, as well as management, operation and maintenance arrangements and, most importantly, on the opinions of the beneficiaries (30 smallholder farmers organized in “Valley of Peace Farmers Association Holdings Limited”), obtained by thorough discussion with them.